Manufacturing
Production planned against real material availability — and costed against the real ledger.
Define multi-level bills of materials, then schedule work orders that check component availability before committing a date.
Quality checks gate each stage, and production cost flows straight into inventory valuation and the general ledger — no separate costing spreadsheet.
Plant managers scheduling production against real material availability.
| Component | Req | Avail |
|---|---|---|
| MS sheet 2mm | 420 | 610 |
| Fasteners M8 | 1,200 | 840 |
| Powder coat — grey | 18 kg | 44 kg |
| Fasteners short by 360 · schedule adjusts automatically | ||
A shortage on one component reschedules the work order automatically — before the floor is idle.
What this module actually does.
BOM management
Multi-level bills of materials with versioning and substitute components.
Production scheduling
Work orders scheduled against live material and capacity constraints.
Multi-stage QC
Inspection gates that hold output until quality criteria are met.
Production costing
Material, labour and overhead costed into finished goods automatically.
See Manufacturing on your data.
Book a walkthrough and we'll run this module against a slice of your real numbers.