Manufacturing
From bill of materials to dispatch, costed against the same ledger finance closes on.
Production planning that respects real material availability, and costing that flows straight into inventory valuation — no parallel spreadsheet, no month-end reconciliation of what the floor actually consumed.
Raw material, work-in-progress and finished goods stay valued and traceable, so dispatch and margin are always current.
| Component | Req | Avail |
|---|---|---|
| MS sheet 2mm | 420 | 610 |
| Fasteners M8 | 1,200 | 840 |
| Powder coat — grey | 18 kg | 44 kg |
| Fasteners short by 360 · schedule adjusts automatically | ||
A component shortage reschedules the work order automatically, before the line stops.
Built for the specifics, not the average.
BOM & routing
Multi-level bills of materials with versioning feeding production plans.
Production costing
Material, labour and overhead costed into finished goods automatically.
Raw-material tracking
Consumption and WIP tracked against work orders in real time.
Dispatch visibility
Finished goods to dispatch, with the ledger updated at each step.
Run QGPEXIM the way manufacturing needs it.
Book a walkthrough and we'll map QGPEXIM to your entities, warehouses and filings.